Band saw setups
Joe Cutting Steel
|
|
|
|
|
|
Finally
all 1"SHS for the frame is cut. Much to our dismay we found several
more compound angles at the end of the cut list. And its back to another
set up for the horizontal band saw. The time required to cut all 1"
frame members for all 3 builds was about 17 man-hours. This is about
5.5 hours per frame however much time was saved by dividing the set
up time by 3. We expect to take advantage of this fact throughout
the entire project. This is only one of the reasons for which I would
recommend any one contemplating building a Locost to try to join forces
with other competent friends. I suspect Eric of figuring this out
first. |
Picture of compound angle
setup
|
|